The main target of this Simulator is to train technical students, workers and even teachers, in how the Energy can be generated, transformed, transported, distributed and how it can be consumed.
Additionally PSS12 allows to simulate all the procedures carried out in real power plant to star up the generation plant, to run it and to connect it to the National grid ( Electrical Network) , etc.
STRUCTURE OF THE COMPLETE SIMULATOR:
The Complete Simulator is formed by two main parts, the first part ( a) with 14 Units and the second one ( b) the Simulation with Generation System Software ( Hybrid System) .
a) Small Scale Electric Power System:
This Small Scale Electric Power System consists of 14 different units ( 1AG1 Generator Unit, 2AG2 Generator and Auxiliary Services Cubicle, 3AT3 Power Transformer, 4AL4 Substation and Lines Cubicle, 5AC5 Loads and Network Equivalents Cubicle, 6BEN1 Electric Control Board 1 ( energy generation) , 7BEL1 Electric Control Board 2 ( transformation and lines) , 8BCE1 Electric Control Desk, 9BPR2 Electric Control Board 3 ( spare) , 10CVW1 Videowall, 11CEP1 Energy Control Desk, 12DAD1-13DAD2-14DAD3 Control Boards ( slides) ) .
This Complete Simulator is built with the same devices as those used in the real Power Plants. Therefore the system reproduces at small scale the functioning of a real Power System.
Not only the steps for starting a Power Plant, but many faults can be simulated.
Kunjungi WEBSITE kami juga di : http://alatperagateknik.com
Teachingequipment.
Kontak Person:Safi'i / Zul ( 0811 893 101 / 0815 614 1954 ).
Alamat: Jl. Pahlawan Revolusi No. 22B.
Telp. +62-21-8611 131, 8611 259, 8611 444, 8611449
Fax : +62-21-8611 207.
EMAIL :sales@alatperagateknik.com
Website :www.alatperagateknik.com